Hi All,
This post is about understanding load and speed set point for STG while working in island operation and working in parallel with grid.
I have 3X16.75MW (2W +1S) STG running in parallel with grid or sometimes in islanding operation. I want to understand the set points to be sent to governors and AVR in both conditions. I have ECS (Electrical Control System) for performing the load sharing system.