Q
Here is a quick tl/dr breakdown of my problem. This is the only information I have on a PM I am supposed to complete: SPEEDTRONIC CONTROL LOOP, TEST SMR-260. What am I supposed to do?
Here is the long story.
My plant is using a MS7001EA GE turbine with MARK VI TMR. I am the only I&C tech here and I don't know much about MARK VI.
Our PM software can be a bit light on the details on what is expected of us. The only clues I have as to what is expected of me is this blurb SPEEDTRONIC CONTROL LOOP, TEST SMR-260 and that it was last completed in 2015. I am looking for direction to develop a procedure on how to perform this test. Honestly, I have never done loop testing before either, which seems to be a software test(?).
I have been looking through our manuals, but we don't have any real maintenance standards on site. At least anything I think of as a maintenance standard. I am a bit fresh out of the Navy.
Any help would be greatly appreciated.
Here is the long story.
My plant is using a MS7001EA GE turbine with MARK VI TMR. I am the only I&C tech here and I don't know much about MARK VI.
Our PM software can be a bit light on the details on what is expected of us. The only clues I have as to what is expected of me is this blurb SPEEDTRONIC CONTROL LOOP, TEST SMR-260 and that it was last completed in 2015. I am looking for direction to develop a procedure on how to perform this test. Honestly, I have never done loop testing before either, which seems to be a software test(?).
I have been looking through our manuals, but we don't have any real maintenance standards on site. At least anything I think of as a maintenance standard. I am a bit fresh out of the Navy.
Any help would be greatly appreciated.