advertisement
from the Forum department...
MW hunting during Base load trial in Gas turbine
Power generation equipment control. topic
Posted by joie on 4 November, 2009 - 3:41 am
power generation take in Mark V frame 6. Once in a month base load trial is take otherwise run on part load. all the parameter is normal during part load except GCV opening is sluggish. now problem is that when base load trial is taken MW hunting start.

also problem is that when base load trial is taken that is IGV opening is 84 main lube oil tank vacuum deteriorate. tank level drop and oil droplet come from mist eliminator. Please solve my problem

Your use of this site is subject to the terms and conditions set forth under Legal Notices and the Privacy Policy. Please read those terms and conditions carefully. Subject to the rights expressly reserved to others under Legal Notices, the content of this site and the compilation thereof is © 1999-2010 Nerds in Control, LLC. All rights reserved.

Users of this site are benefiting from open source technologies, including PHP, MySQL and Apache. Be happy.


Fortune
Any time things appear to be going better, you have overlooked
something.
Advertise here
Advertisement
our advertisers
Help keep our servers running...
Patronize our advertisers!
Visit our Post Archive