A
At our site we are working on a GE Frame 9E GT. the liquid fuel purge air scheme shows three valves namely 20PL, VPR-54, VA-19 which together control the flow of air into the purge air manifold. The air comes from the discharge line of the atomizing air compressor. 20PL when energized opens the stop valve VA-19 to permit air into the purge air manifold. VPR-54 allows the atomizing air system pressure to reach a lower level for energizing 20PL. On consulting the O&M manual we found that before switching to gas fuel from liquid fuel we need to purge the fuel nozzles. As we will be using only liquid fuel as of now, we feel that there is no need to use the purge air system. Question is that at site we need to fix these two valves along with the piping, if it is not required then we will not erect/commission this line. Kindly comment and advise.