I
GE-FR5 -MS5002 driving centrifugal compressor in LNG plant
Starting system composed of: Electric induction motor+ hydraulic torque converter+ SSS clutch + accessory gear box.
Finding: GTC starting system fail to continue during acceleration mode and SSS clutch disengaged at %TNH decreased from 54% to 51% then 49% during 3- consecutive starts
Action:
1. Replaced the check valves located on the lub oil filling line for torque converter priming & 20 TU located at torque converter outlet 50.9% starting system disengaged
2. Replaced the torque converter with new 50.9% TNH starting system disengaged
3. No evidence of wear notice for SSS-clutch parts
4. Electrical team confirms that same parameters for starting motor (phase voltage & current value, PF)
Please, your advice?
Starting system composed of: Electric induction motor+ hydraulic torque converter+ SSS clutch + accessory gear box.
Finding: GTC starting system fail to continue during acceleration mode and SSS clutch disengaged at %TNH decreased from 54% to 51% then 49% during 3- consecutive starts
Action:
1. Replaced the check valves located on the lub oil filling line for torque converter priming & 20 TU located at torque converter outlet 50.9% starting system disengaged
2. Replaced the torque converter with new 50.9% TNH starting system disengaged
3. No evidence of wear notice for SSS-clutch parts
4. Electrical team confirms that same parameters for starting motor (phase voltage & current value, PF)
Please, your advice?