Dears,
What could be the best practice to stop the GE Frame-9E machine while on 100% load (100 MW)?
The reason we are asking that, grid control room are asked us to stop the machine immediately when they feel not necessary.
As of now we are going for unloading at 10 MW interval and once reached 5 MW "Stop" command will be given.
We assume that if "Stop" given at 100 MW it'll treat as trip procedure.
Your suggestions /advice are highly welcome.
Take care
G.Rajesh
What could be the best practice to stop the GE Frame-9E machine while on 100% load (100 MW)?
The reason we are asking that, grid control room are asked us to stop the machine immediately when they feel not necessary.
As of now we are going for unloading at 10 MW interval and once reached 5 MW "Stop" command will be given.
We assume that if "Stop" given at 100 MW it'll treat as trip procedure.
Your suggestions /advice are highly welcome.
Take care
G.Rajesh