O
our steam turbine of combine cycle power plant (GTG+STG= 72+40) is ruining on 10 MW; suddenly it trip on reverse power relay. and after that it is running on 7 MW and suddenly trip on low forward power. both the time steam turbine parameter is ok. so problem