Boiler Re-rating/Revamping

D

Thread Starter

dax2172

We have one boiler of 105 kg/cm2 pressure with 130 Tons per hour capacity (505 Deg. C)which is no longer in use now as we have stopped our steam turbine/power generation.

Now our new steam requirement for process plant is 50-70 Tons per hour at 50-60 Kg/cm2 pressure.

Can our existing boiler be re-rated or modified to meet our new requirements?
 
Top