J
I am a new engineer at this company and don't know the background of the GE Frame 6 (45MW) unit. But I heard after we installed the new IGV, the minimum load has to run at 18 MW instead of 5MW.
Please explain why this is.
Thanks!
Please explain why this is.
Thanks!