Regarding Calculation of Load Margins in 210mw Turbine

V

Thread Starter

vipulvyas37

In our 210mw kwu bhel make steam turbine there is always mentioned two things: upper load margin that is usually around 77mw and lower load margin that is usually around 89 mw. The above conditions mentioned is at 167mw load. How the margins are calculated?
 
Top