Recent content by ChristensonWJ

  1. ChristensonWJ

    Steam Turbine Emergency Overspeed Probes Not Sending Signal (2/3) - L14H_ZE

    Good morning, During a recent major outage, we replaced and rewired three primary and three emergency overspeed probes. We had high vibration during startup (another issue altogether) and had one of the emergency overspeed probe wires come loose, producing a 0 signal in the prevote logic. After...
  2. ChristensonWJ

    Turbine Speed Remote Indicator (TNH_RPM) on MK-V

    We are looking to add a remote turbine speed indicator to our turbine for use during a water wash. For ease of installation, we are attempting to duplicate a signal coming from the MK-V Comm Link to use as a drive signal for the RPM meter. Can anyone point me in the right direction on how to...
  3. ChristensonWJ

    Operation of ST Admission/Extraction Valve at Low Load

    Back for another question. This forum seems to be the only source of reliable information on the MK-V that I have found. Tech manuals are severely lacking. I am trying to better understand the operation of our ST admission/extraction valve during a period of low loading. A little back...
  4. ChristensonWJ

    Reduced Power Operations of a Baseload Plant

    Good evening, I will try to ask these questions briefly. Please be kind as this is my first post to this forum, and I am fairly new to the industry. (as far as GT's are concerned). Plant info: 7EA GE Gas Turbine (DLN1+) MKV GE Control System GE Steam Turbine Plant MW Control Enabled...
Top