    505 Turbine Control "Over speed"

    Dear Sir Our generator are 2 x 7 MW, the governoor controlled by woodward 505, contract capacity are 11 MW, internal power consumtion for about 1 MW. First start turbine using speed mode, then generator connect to the grid using limiter, the problem is, when grid cutout, our woodward 505 trip...