  1. Huruhara

    House Load vs Islanding Mode Operation for GT

    Hi, what is the different between house load operation and islanding mode? is it different? The main question is GT has time limit for house load operation. It said "GT can perform house load operation for 2 hours duration". why there is time limit? is there parameter we need to monitor...
  2. Huruhara

    D652 Steam Turbine Startup

    Hello everyone, Right now i'm dealing with the project of D652 Steam Turbine and it's single shaft with GT 9HA.02. Due to after this project I will operate the plant. All I want to ask is, the detail for D652 ST start up. From my previous plant, there is Sliding and Fixed Pressure mode during...
  3. Huruhara

    GE 9HA.02 GAS FUEL OPERATION MODE

    Hello everyone, I'm new here in this site web, I would like to understand how gas fuel operation mode in 9HA.02. There is Mode 4.1, Mode 6.2 (MECL), Mode 6.2A and 6.3A. The gas fuel module has PM1, PM2, PM3 and AFS. I hope someone can provide me the information about this discussion. Best...