1. arunrajput1990

    Frame 5 GT loading problem after MI

    Good Evening Sir I am working on frame 5 GT (PG5371PA) with mark VIe control system for captive power plant at part load with IGV Exhaust Temp control mode ON. We started our GT after MI and uprate in first week of may. Following control constants were changed by maintenance TTK_K-63.9 to 65.96...
  2. arunrajput1990

    PG5371PA frame 5 turbine running parameter fluctuation problem

    we are running frame 5 turbine (PG5371PA) in isochronous mode at load 16.96 MW. Turbine connected load is constant as plant load is constant. plant load varies up to 50-200 KW. base load rating is 22.4 MW. All running parameter was stable. At Mark VIe panel, "Back up reference Temp active "...
Top