We have a gas turbine generator.
Use Woodward 2301 load sharing and speed control (8271-394) to control the loader valve.
How to connect plc to Woodward 2301
to control t5 temperature
Hey, we have solar turbine Gas Generator mars 100 produced 2013
The Problem Flameout high fuel flow
the PID Control of the gas valve late to reach the desired point when the full load is lost but with a gradual pregnancy loss, the problem does not occur
please help.
if the generator ( mars 100) nominal voltage is 6.6V and the nominal Bus A
voltage is 66kV.
Composition:
generator(6.6kv) _ Transformer (66kv)
1407-CGCM-DLR how to achive synchronization.