Hello all. First time poster so forgive any mistakes.
I work in a plant which operates six GE Frame 7EA DLN-1 gas only simple cycle CT's. These units were installed in 2000 and went commercial in 2001. All units have MARK V/<I>/EX2000 for control and use Constant Settable Droop.
The company which owns the plant, and many others, wants to develope a general procedure for testing the "Turbine Governor Deadband and Droop" for the fleet. Each plant then would make the procedure specific to their equipment. I have spent the past couple of days, on and off, searching for a procedure for testing Droop control to no avail. I have searched our manuals and there is no mention of testing once it's set.
Based on the above, I have a few questions:
1. Does anyone else do this type of testing?
2. If so, where did you get the procedure or did you develope your own?
3. Is there really a need for this? It seems to me that once the constants are set, nothing should change.
Thanks in advance for any information.
RichT88
I work in a plant which operates six GE Frame 7EA DLN-1 gas only simple cycle CT's. These units were installed in 2000 and went commercial in 2001. All units have MARK V/<I>/EX2000 for control and use Constant Settable Droop.
The company which owns the plant, and many others, wants to develope a general procedure for testing the "Turbine Governor Deadband and Droop" for the fleet. Each plant then would make the procedure specific to their equipment. I have spent the past couple of days, on and off, searching for a procedure for testing Droop control to no avail. I have searched our manuals and there is no mention of testing once it's set.
Based on the above, I have a few questions:
1. Does anyone else do this type of testing?
2. If so, where did you get the procedure or did you develope your own?
3. Is there really a need for this? It seems to me that once the constants are set, nothing should change.
Thanks in advance for any information.
RichT88