K
I have a 'simple' problem at hand. Hope to find a witty solution.
We have an Energy Meter (make is GEC Measurements, UK) that collects kWh readings from one of our GTGs. The meter needs to be sent for calibration. It is likely to take 10 days. During these 10 day period the GTG will be running and I can arrange for an additional Energy Meter to take readings. When the existing meter comes back, how do I 'enter' these 10 days readings so that the operator doesn't have to always 'add' the readings of these days for which the meter was sent for calibration?
Any input would be really helpful.
Thanks and regards,
Kevin
We have an Energy Meter (make is GEC Measurements, UK) that collects kWh readings from one of our GTGs. The meter needs to be sent for calibration. It is likely to take 10 days. During these 10 day period the GTG will be running and I can arrange for an additional Energy Meter to take readings. When the existing meter comes back, how do I 'enter' these 10 days readings so that the operator doesn't have to always 'add' the readings of these days for which the meter was sent for calibration?
Any input would be really helpful.
Thanks and regards,
Kevin