D
We operate a CCGT GE 9FA and are required by our system opearator to be capable of operating on both gas and liquid fuel. We are able to switch from gas to liquid fuel seamlessly but have been informed by GE that we are required to reduce load to circa 35MW in order to charge from liquid fuel back to gas. The system operator has asked us to investigate how we may be able to switch back to gas at higher loads. Would anyone be able to explain to me why we are required to reduce load to change back from distillate to gas and if there is any technical fix that can be employed to improve this?