G
I have GT Frame 7E with MarkVI. When the unit starts we noticed the speed is going slowly, we get from the first after giving start alarm say (torque converter not running), we checked the C.B. for torque converter. We found it had overload. We reset it, but it did not accept to reset. The speed of the turbine is raised up but slow compared to normal, and it reached to FSNL and synchronized. The current for starting motor was 85 amp., its normal is about 150amp. The question is, if the torque converter was not run how the speed was going up, and how we can reset the overload on torque converter? What should we do to solve this problem?
Regards.
Regards.
