Hard-to-control processes

  • Thread starter Sumeet Chimalkar
  • Start date
S

Thread Starter

Sumeet Chimalkar

A problem from a particularly fascinating project.

In an LPG 'vaporizer', the liquid level was supposed to be controlled by a DCS loop at 'almost' zero. The DP Level transmitter selected had a minimum span which was too high for the application. The solution (Not by me): A Reflex Level Gauge with an operator standing by
to manually throttle the vaporizer inlet valve.
Any comments anyone?

Sumeet Chimalkar
Instrument Engineer
Clough Engineering Ltd
 
N

narendrakumar

Loadcell weighing method was used to fill LPG gas,nozle can be open until the required tare level is reached,or time based we can open the nozle
 
J
You may be on to something...
Why not put a human in each of the DCS loops? You could also give the man a bell to ring in case an alarm level is reached!
 