N
We have been unsuccessful creating a timed ramp up to a set point temp. We have been trying to use the manual, but are clearly missing something.
ideally we need to ramp up to 900' over a 90 minute time. right now we have the control alg set to on/off. do we need to use pid a or pid b instead? or is there some simple step we are missing?
thanks for any help.
ideally we need to ramp up to 900' over a 90 minute time. right now we have the control alg set to on/off. do we need to use pid a or pid b instead? or is there some simple step we are missing?
thanks for any help.