R
Hello All:
In a manufacturing environment covering several production areas with perhaps 50 PLC and HMI systems, what proportion of his time should
a control tech expect to spend on occasional program mods, occasional training of trades persons, supervising upgrades of existing equipment, making the odd network change, and infrequent breakdown help?
The area is fairly static, and my feeling is that one day a week should be plenty.
Is this in the ballpark?
Thanks, and best regards to the List!
Rick
[email protected]
[email protected]
In a manufacturing environment covering several production areas with perhaps 50 PLC and HMI systems, what proportion of his time should
a control tech expect to spend on occasional program mods, occasional training of trades persons, supervising upgrades of existing equipment, making the odd network change, and infrequent breakdown help?
The area is fairly static, and my feeling is that one day a week should be plenty.
Is this in the ballpark?
Thanks, and best regards to the List!
Rick
[email protected]
[email protected]