M
Power and free overhead conveyor.
I am planning to use three Siemens HMI TP
panels with single S7-200 PLC unit. HMI panels are located at three different locations, such as one at loading point, another one at unloading point and the last one on main control panel.
I am planning to use three Siemens HMI TP
panels with single S7-200 PLC unit. HMI panels are located at three different locations, such as one at loading point, another one at unloading point and the last one on main control panel.
