S
IS IT NECESSARY TO EARTH A SMPS (SCHNEIDER ABL1RPM24100 I/P -230 V AC,O/P-24V 10A) WHOSE INPUT IS FROM A 230V AC UPS(IT HAS A FLOATING GROUND) IN A PLC CABINET.
IF IT IS NECESSARY,WILL THERE BE A PROBLEM IF IT IS CONNECTED TO INSTRUMENT EARTH.
PLEASE HELP
IF IT IS NECESSARY,WILL THERE BE A PROBLEM IF IT IS CONNECTED TO INSTRUMENT EARTH.
PLEASE HELP