B
We have 2 - 2MVA, 22/0.433kV Xfrmrs feeding two 415V LV Switchboards and in turn various LV loads. The switchboards have a bus-tie to enable the LV loads to be powered even if one supply/Xfrmr fails. The LV Switchboards incomers have a REF relay. The phase CTs are 3000/5A. I understand that the all the CTs should have the same ratio as the currents need to balance out during normal operation. Mismatched CTs will cause 'Spill Current' to flow through the relay path.
Your comments!
Your comments!
