A
We have a set of time for gas turbine purging which is 15 min prior the start of turbine to protect against gas leak. We want to reduce the time or skip it after a failed start.
When I had a look at the standard, it says boiler shall be purged before a cold start with the airflow higher than the %70 normal capacity. There seems no time limit for the purge set. Have you got any simliar application for reducing time set?
When I had a look at the standard, it says boiler shall be purged before a cold start with the airflow higher than the %70 normal capacity. There seems no time limit for the purge set. Have you got any simliar application for reducing time set?