I am considering a new plant network that is primarily supervisory. It covers 5 production lines. Should I be bothered with redundancy? I have considered putting all global areas (equipment that is common to all 5 lines) together on one switch with redundancy whilst leaving all other equioment like line 1 on one switch and line 2 on another switch thus minimizing affect if one goes down. Does it really matter any more? All peripheral equipment I was going to place on another switch. Is there an art to this or is it just common sense.
Any advice will be greatly welcomed.
TIA
Geoff