PSV installation on top of vent line

A

Thread Starter

anri

Hi everybody,

We want to install a PSV(rated 7-8 bar) on 24" diesel line, but instead of installing it separately (because we don't want to stop pumping diesel) one of our engineers wants to install in on top of the vent line, without interfering production.

I don't want to get much in to the details, my question is: Shouldn't the psv line be fully separately, regarding some standard or engineering practice?

What about vent line down the psv?
regards,
anri
 