relative humidity in curing oven

H

Thread Starter

Hank G

We are building a 12,000 cft curing oven. Final operating temp to be 200F @ 100% RH.

We know how much water will be required to bring 180F air to 100% RH but as we go through reheat to 200F what will be the additional H20 required.

Is there a spreadsheet calc that we can use to vary our control parameters?

We know we'll have condensation on the floor as we go through this cycle.
 
Top