We are retro-fitting the existing Mark 2 DCS of a GE Frame 5 turbine with a Siemens T3000 DCS. The existing control system is quite old and plant data is not complete. We are replacing the Turbine controller, Turbine protection, AVR, synchronising unit and Gen/Transformer protection systems. I need assistance for the same.
The information required for engineering the new systems are:
1. Control Logic Sequence overview (start-up/shutdown)
2. Turbine Controller Logic overview
3. Turbine protection overview
4. Typical Input/Output lists including drives, solenoid valves, actuators etc.
5. Servo-mechanism details and calibration method
6. Start-up device operation philosophy
7. Typical control specification settings list
You may also reply to my email: kpk110170 @ yahoo. com
The information required for engineering the new systems are:
1. Control Logic Sequence overview (start-up/shutdown)
2. Turbine Controller Logic overview
3. Turbine protection overview
4. Typical Input/Output lists including drives, solenoid valves, actuators etc.
5. Servo-mechanism details and calibration method
6. Start-up device operation philosophy
7. Typical control specification settings list
You may also reply to my email: kpk110170 @ yahoo. com