SCADA Integrity Cycles

  • Thread starter Roberto A. Ricardi
  • Start date
R

Thread Starter

Roberto A. Ricardi

Dear groups members,

I'm a hardware manager, have a electrical control center with about 50 utr's working in DNP 3.0 protocol. All the digital and analog points are
treated like events, and we use a periodic global static cycle as usually. I need to know where ( IEC 870 ?) can I find the best relation to fi the global static cycle period.

Thanks in advance for your attention.

Roberto A. Ricardi
SACME S.A.
Buenos Aires, Argentina
[email protected]
 
Top