hi,
am working in thailand power plant.control by MK-V ,MK-VI and MK-VIe fram 5 and 6.
am Experiencing problems. gtg control by MK-VIe reduce 0.5 MW (35 to 34.5 mw) steam injection Trip by control vlv trip lock out Frequent
The instructions on how to fix the problem
am sorry english no good.