M
Can anyone please help? I have a application where I want to totalize ore. We fill a flask with rock, and on a digital input from the field I want to take the mass (Read in as a PIW)into a Siemens S7-315,and add it up every time.This happens about 300 times a day. The totalizer must then be reset every morning at six. The total loaded rock must be read from a DB and sent to a SCADA.
Thanks
Thanks