A
Mark-II is installed on one of our turbines. We have faced grounding faults both Speedtronic and 125VDC from last 8 years. Recently i have traced these grounds and rectified them. I have also developed a complete case study of this hectic job. This paper would be very helpful in finding Ground faults not in MARK-II control system but in other systems too.
Plz let me know what is the proper forum to float this paper/report (GE or ISA any other forum).
Thanks
Plz let me know what is the proper forum to float this paper/report (GE or ISA any other forum).
Thanks