V
I wish to know if a TUV approved ESD system allows to split the processor and I/O to two different physical locations.
I mean PLC processor in Central control room and I/Os in the field remote I/O room. (Though I feel TUV won't approve splitting)
Regards,
Mathiyazhagan
Technip India Limited
0091-44-2230 3361
I mean PLC processor in Central control room and I/Os in the field remote I/O room. (Though I feel TUV won't approve splitting)
Regards,
Mathiyazhagan
Technip India Limited
0091-44-2230 3361