A
I am a controls engineer in the heavy industries doing basic engineering and design in control systems. Recently someone I know suggested to move over to validation in pharmaceutical industry. I am confused on the issue in terms of choice of industry (heavy and pharma) and in terms of the work (basic engineering and design to validation). Some people think validation to be non-technical (is it so?). Any comments as a help to clear the confusion or add to it?