B
I'm wondering if anyone might have experience in temperature control of cold WFI where there are two heat exchangers in series. One is a chilled water to WFI hx where a modulating chilled water valve is manipulated. The other is a free-cooling WFI to condenser water hx a modulating condenser water valve is manipulated. The current scheme is a split range PID that favors the free cooling first and then chilled water once the free cooling is maxed out.
