Today is...
Saturday, July 20, 2019
Welcome to Control.com, the global online
community of automation professionals.
Featured Video...
Featured Video
Watch an animation of a conveyor stacking operation demonstrating the use of a move on a gear command.
Our Advertisers
Help keep our servers running...
Patronize our advertisers!
Visit our Post Archive
Major Overhaul for a Frame 5 GE Gas Turbine
In-between clearances between shroud blocks at GE gas turbine frame 5

Hi everyone,

Briefly, during carrying-out a major overhaul for a GE gas turbine frame 5, we replaced the old 1st stage & 2nd stage shroud by a new set. After installation the new set, we found the in-between clearances between some shroud blocks are wider than the other ones. After reviewing the manual, I found no information about this clearances or gaps.

So the question, is this gap or clearances will affect the turbine efficiency or maximum power or heating the casing after start-up?

Note: l have photos but i don't know how to upload with the topic.

Moderator's Note: You need to upload the photo to a separate site, and post a url to the photo.