We are having 18MW captive power plant to fulfill requirement of power and steam in company. This TG set will run in LOAD mode parallel with GRID.
Lets assume that we are running with 14MW on our TG set when there is sudden tripping of load e.g. 07MW then our TG set will continuous run on 14MW and additional load of 07MW will pump into the GRID.
Now in the GRID there are so many TG set running parallel with LOAD mode so my question is which TG set will reduce this load of 07MW??