Log In
Join
Join the Community
Register
Log in
Or sign in with
Facebook
Google
GitHub
Linkedin
SIGN UP FOR OUR NEWSLETTER
Register
Main Menu
Home
Explore
Products
Cabinets & Panel Components
CNC Machines
Communication & Security
Connectors, Wire & Cable
Data Analytics & Simulation
Electrical Power Control
HMIs & SCADA
Motors & Controls
PLCs & PACs
Pneumatics & Hydraulics
Robotics
Safety
Sensors & Instruments
View all
Industry
Advanced Mfg
Agriculture
Automotive
Building
Chemical
Electronics
Energy & Infrastructure
Food & Beverage
Forest Products
Logistics
Medical & Pharma
Metal
Military & Aerospace
Natural Resources
Plastics & Polymers
Product Mfg
View all
Content
Ebooks
Forums
Industry Articles
Industry Webinars
Industry White Papers
News
Partner Content Hub
Technical Articles
Textbook
Tools
Worksheets
Articles
Latest
News
Technical Articles
Industry Articles
Industry White Papers
Forums
Latest
General Discussion
Hardware
Software
Communication
Education
Textbooks
Video Lectures
Worksheets
Industry Webinars
Ebooks
Tools
Videos
Latest
Industry Videos
Industry Webinars
Video Lectures
Giveaways
Partner Content Hub
Contact Us
Register
Log In
Network Sites
Search...
Home
Members
CSA
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
Recent content by CSA
Search Forums
New Posts
Choosing overspeed protection system for steam turbine
Hannan900, They are all probably equally adequate for overspeed detection and protection. They can all probably be powered from available power source(s) at your site. They all probably have different options and features, some of which may be useful at your site and many of which may not be...
CSA
Post #2
Jan 23, 2020
Forum:
Instrumentation & Measurement
Mark VIe isoch speed control
jeff3030, GE has become really fragmented in recent years; there are different divisions of GE that are selling and configuring Mark VIe turbine control systems differently (wonderful, right?!?!). If you had a Mark V then it's likely you have one of the Mark V-to-Mark VIe "Migration" or Life...
CSA
Post #4
Jan 22, 2020
Forum:
Power Generation
Mark VIe isoch speed control
jeff3300, Difficult to say with any degree of certainty without being able to see the application code running in the Mark VIe to see if there is any special or unique code. And there's a LOT of that going around (special, unique code) these days. Generally, though, when dead bus breaker...
CSA
Post #2
Jan 22, 2020
Forum:
Power Generation
What is the benefit of FNI and what will trigger FNI?
PowerGeneration, I can only answer this question specifically for GE-design heavy duty gas turbines and generally for other gas turbines that use exhaust gas temperature sensors to monitor for combustion problems. Fuel nozzle inspections are warranted when there are higher than normal exhaust...
CSA
Post #2
Jan 21, 2020
Forum:
Power Generation
Variation in Gas Turbine load (MW)
Also, what are the IGVs doing when the load swings are occurring?
CSA
Post #6
Jan 21, 2020
Forum:
Power Generation
Variation in Gas Turbine load (MW)
Since Pre-Selected Load Control uses feedback from a load (MW) transducer, it's possible the load transducer, or one of its inputs (potential transformer; current transformer) is failing or having a problem. It would require a shutdown and a person or persons with some sophisticated test...
CSA
Post #5
Jan 21, 2020
Forum:
Power Generation
Control valves, to control speed with limited feedback
MartinFO, Hmmm.... I'm not sure I really understand the set-up or the need to control the speed. And I'm really not familiar with trying to measure speed with a reed switch and magnets. But I think you need more pulses in a shorter period of time than you are getting, especially if you want...
CSA
Post #2
Jan 20, 2020
Forum:
General Automation Chat
SRV Fluctuating
luiss, To Continue (due to the 10000 character limit imposed by control.com)... You say the SRV is fluctuating. What is the GCV doing when the SRV is fluctuating? Is it also moving? Do you always used Pre-Selected Load Control to operate the turbine to maintain a particular load? There is a...
CSA
Post #5
Jan 20, 2020
Forum:
Power Generation
SRV Fluctuating
luiss, I'm going to presume the turbine-generator is older and previously had a earlier Mark* turbine control system and was upgraded to a Mark VIe. I interpret your statement about "... operating with a reduced load of 4 MW for a long period of time (more then one year). ..." to mean the unit...
CSA
Post #4
Jan 20, 2020
Forum:
Power Generation
Variation in Gas Turbine load (MW)
dax2172, I know the operators and their supervisors and the instrument department personnel will ALL cringe and be shocked at the suggestion of running the unit without Pre-Selected Load Control active because they are just all CERTAIN that the unit will drift to any load and be "out of...
CSA
Post #4
Jan 19, 2020
Forum:
Power Generation
Variation in Gas Turbine load (MW)
dax2172, Can you please provide better data on both the TNR and TNH variations? What happens when you click on RAISE SPD/LOAD or LOWER SPD/LOAD (which disables Pre-Selected Load Control but would not results in excessive load swings!)? Disabling Pre-Selected Load Control should result in a...
CSA
Post #2
Jan 19, 2020
Forum:
Power Generation
Gas Turbine Flame Detection
gtengineer, If there is humidity condensing on the Reuter-Stokes Flame Trakker lenses, the problem is most likely that the cooling water flow to the sensors is not being properly regulated. There are supposed to be needle valves in the cooling water discharge tubing which are to be adjusted to...
CSA
Post #4
Jan 17, 2020
Forum:
Instrumentation & Measurement
Gas turbine starting system
farhan317, The ability to "private message" people on this forum is a mixed blessing. The really GREAT thing about these kinds of forums is that MANY people can benefit from the questions and answers of one person over many years. It's a very unselfish thing to participate in these open...
CSA
Post #8
Jan 17, 2020
Forum:
Power Generation
Gas turbine starting system
farhan317, Usually, there is one (1) starting means for a gas turbine. (A starting means can be an asychronous (induction) motor, an expander turbine, a diesel engine, a hydraulic starter, a pneumatic starter, even a synchronous motor (one temporarily converted from a synchronous generator for...
CSA
Post #6
Jan 16, 2020
Forum:
Power Generation
Gas turbine starting system
Sounds like a school science project. Because you haven't stated what the power of the gas turbine asynchronous starting motor (also normally called an induction motor by people in the industry, and an asynchronous motor by people in school) requires. You need to know that, and you need to...
CSA
Post #5
Jan 16, 2020
Forum:
Power Generation
Top
Continue to site
QUOTE OF
THE DAY
“
”
-