Log In
Join
Join the Community
Register
Log in
Or sign in with
Facebook
Google
GitHub
Linkedin
SIGN UP FOR OUR NEWSLETTER
Register
Main Menu
Home
Explore
Products
Cabinets & Panel Components
CNC Machines
Communication & Security
Connectors, Wire & Cable
Data Analytics & Simulation
Electrical Power Control
HMIs & SCADA
Motors & Controls
PLCs & PACs
Pneumatics & Hydraulics
Robotics
Safety
Sensors & Instruments
View all
Industry
Advanced Mfg
Agriculture
Automotive
Building
Chemical
Electronics
Energy & Infrastructure
Food & Beverage
Forest Products
Logistics
Medical & Pharma
Metal
Military & Aerospace
Natural Resources
Plastics & Polymers
Product Mfg
View all
Content
Ebooks
Forums
Industry Articles
Industry Webinars
Industry White Papers
News
Partner Content Hub
Technical Articles
Textbook
Tools
Worksheets
Articles
Latest
News
Technical Articles
Industry Articles
Industry White Papers
Forums
Latest
General Discussion
Hardware
Software
Communication
Education
Textbooks
Video Lectures
Worksheets
Industry Webinars
Ebooks
Tools
Videos
Latest
Industry Videos
Industry Webinars
Video Lectures
Giveaways
Partner Content Hub
Contact Us
Register
Log In
Network Sites
Search...
Home
Members
Dave
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
Recent content by Dave
Search Forums
New Posts
D
Honeywell TDC3000 Printer Showing Offline
Good luck with the trouble shooting
Dave
Post #2
Friday at 10:02 AM
Forum:
General Automation Chat
D
Who Is Responsible for System Integration Testing in Complex Automation Projects?
Companies rely on those who are able to identify the flaws in the automation, given an understanding of the process and the project goals, the sensors, and actuating devices. It is not a teachable subject.
Dave
Post #8
Sep 18, 2026
Forum:
General Automation Chat
D
Who Is Responsible for System Integration Testing in Complex Automation Projects?
Apart from the design and purchase phase, you have construction completion checks and testing, then pre-startup testing, and finally operational and shutdown testing. You are on the right track.
Dave
Post #6
Sep 18, 2026
Forum:
General Automation Chat
D
Who Is Responsible for System Integration Testing in Complex Automation Projects?
"I would like to clarify one point. In your experience, during the development, integration, testing, and commissioning stages (before the system enters normal operation), is there usually one person or one engineering role that coordinates the overall system integration process?" All...
Dave
Post #4
Sep 18, 2026
Forum:
General Automation Chat
D
Who Is Responsible for System Integration Testing in Complex Automation Projects?
all of the above, and don't forget the operation and maintenance staff that run the plant, or the engineering construction team. What is just as interesting, in dealing with multinational teams and languages, the the goal is a reliable and safe design.
Dave
Post #2
Sep 18, 2026
Forum:
General Automation Chat
D
A Control Loop That Provably Never Acts on Stale State
You certainly need to contact those involved in such research. https://ieeexplore.ieee.org/document/10371395
Dave
Post #5
Aug 30, 2026
Forum:
Programmable Logic Controller - PLC
D
A Control Loop That Provably Never Acts on Stale State
This addresses several approaches to introducing new concepts https://owl.purdue.edu/owl/graduate_writing/graduate_writing_genres/graduate_writing_genres_conference_presentations_new.html
Dave
Post #4
Aug 28, 2026
Forum:
Programmable Logic Controller - PLC
D
A Control Loop That Provably Never Acts on Stale State
Given that you want a review, the usual approach is to present it at a conference
Dave
Post #2
Aug 27, 2026
Forum:
Programmable Logic Controller - PLC
D
How do you know when a soft sensor / inferential model has silently gone wrong?
So how many process variables are you monitoring and the level of measurement redundancy required, together with the number of control variables being used to achieve the desired outcomes.
Dave
Post #4
Aug 24, 2026
Forum:
General Automation Chat
D
Measuring Sulfuric Acid 98% Flow
Acid flow measurement well understood. Contact the major instrument suppliers in your area. The key is getting proper support from the supplier when things get complicated.
Dave
Post #9
Aug 19, 2026
Forum:
General Automation Chat
D
Life expectancy of 24VDC power supply continuously being in use in DCS & PLC System
Indeed, even solder connections have a MTBF
Dave
Post #4
Aug 13, 2026
Forum:
General Automation Chat
D
Calibration of new type DP Level Transmitter Make Endress+Hauser
The volume of the horizontal tank is immaterial, only the liquid level relative to the transmitter connection. Such factors have been studied for thousands or years, from Archimedes on...
Dave
Post #6
Aug 13, 2026
Forum:
Sensors & Calibration
D
Life expectancy of 24VDC power supply continuously being in use in DCS & PLC System
Those numbers indicate that the greatest loss of reliability is outside of the control of the manufacturer, and in the hands of the end user.
Dave
Post #2
Aug 13, 2026
Forum:
General Automation Chat
D
Process Engineers: What's one thing you'd improve about your plant's alarm system?
There is no simple answer as it involves process design, and how are the controls and alarms supervised. The latter dictates that operations and maintenance staff be involved in the design review.
Dave
Post #3
Aug 6, 2026
Forum:
Safety
D
PLC programming books
George Boole offers a good introduction "The Laws of Thought."
Dave
Post #2
Jul 24, 2026
Forum:
Programmable Logic Controller - PLC
Top
Continue to site
QUOTE OF
THE DAY
“
”
-