Recent content by ECS 9E

  1. E

    GE FRAME 9E GAS TO LDO FUEL CHANGEOVER , SOLINOID 20PL-1 DEENERGIZE TIMING AFTER OPERATOR COMMAND INITIATE.

    Dear CSA our expert of GE 9E, I have a question , we have DLN 2.1 Gas Turbine always we face issue after fuel mode changeover . I go through all trends of fuel mode changeover gas to liquid at 20 mw. Total fuel changeover full time 1 min 2 sec (almost 15 changeover reviewed) we changeover...
Top