    engimad replied to the thread VPR 1,2.
    Its frame 5 installed in 1980. Uses natural gas
  • E
    engimad replied to the thread Ge frame 5,6 fired shutdown.
    Dear . My quastion was during the startup sequence and the speed reach 3000 rpm and for vibration increasing reason the operator push...
  • E
    engimad replied to the thread VPR 1,2.
    Dear Beab. We cheched the ckeck valves and pressure droping was real and we saw it in the gauges . Do you think VPR1 cause this problem ?
  • E
    engimad replied to the thread VPR 1,2.
    Dear Dear WTF? We cheked the check valves it is gravity type and seems ok. Also pressure switched are in good condition and we saw the...
  • E
    engimad posted the thread VPR 1,2 in Control Valves.
    Dear all. In our frame 5 units ,when the unit reach FSNL and during the electrical AC pump goes out the trip( control ) oil pressure...
  • E
    Dear all. Iam asking about the sequence of shutdown of a f5 or f6 GE units during accelaration like 3000 rpm . Is the unit continue in...
  • E
    engimad posted the thread GE markv in Power Generation.
    Dear all. In our frame 6 manuals the TTXSPL equation was ( 0.145 ttxc - 0.08 ctda + 30 ). But when i calculate the according to the live...
  • E
    engimad reacted to J OP's post in the thread GE MarkV with Like Like.
    If you can use the existing EEPROM, U9 from memory, match the and hardware jumpers on the new card. I don't believe you should need to...
  • E
    engimad posted the thread GE MarkV in Power Generation.
    Dear All. In case i want to change DCCA Card in Core < C > the comunication with < I > will loss then how can i downlod on < C > ? Regards..
  • E
    engimad replied to the thread GE Markv.
    Thanks alot. I format <R> and download agin .now its ok.
  • E
    engimad posted the thread GE Markv in Power Generation.
    Dear all Iam working on GE Markv IDOS system in frame 6 units. I have aproblem in DWATT reading for <R> in prevote data desiplay page...