  1. Y

    Frame 9E dual fuel gas turbine with water injection as the nox control

    Hi All, We are currently running a frame 9e dual fuel gas turbine (as originally designed) with diesel fuel only. Although the turbine is designed for both gas fuel and diesel operation, it has never run in gas fuel due to unavailability of gas. Currently we are looking forward to receiving gas...
  2. Y

    Legacy Alstom Frame 6B gas Turbine Ventilation Fan 88BT

    Hi All, We are operating 2 frame 6b gas turbines manufactured in 1987 and I have few questions around compartment ventilation system. Any information would be highly appreciated. 01. There is a ventilation fan mounted in-between accessary compartment to Turbine compartment (88BT). Does the...
  3. Y

    MHI 701D Spare parts supply- non OEM contacts

    Dear All, We are looking forwards to buy MHI 701D combustion parts, consumables and some refurbishment work. Dealing with MHI Japan had been very slow process. Any suggestion of prospective service providers/part suppliers that you would have used would be really appreciated.
  4. Y

    Inlet Air Filter Life Frame 9E gas Turbine

    Dear All, We have couple of Frame 9E peaking units with Donaldson Spider web Conical and cylindrical Filters + pulse cleaning system installed. I would like to seek information and experience on expected filter life. The filter DP does not go high due to less dusty environment hence the...
  5. Y

    Header Pressure Low Switch and Transmitter of GE Frame 9E to Elin 9A5 Generator

    Hi, I am looking forward to see any a P&ID or a schematic that shows the valve position of Low lube oil header switch and transmitter arrangement. see the attached picture of how it looks like. I am particularly after the position of porting valves. should both of them be closed during normal...
  6. Y

    GE Frame 9E -TIL 1720 for Stage 3 Bucket Airfoil Inspection

    Hi, We are operating with a S3B kit that is applicable to subject TIL in one of 9E turbine. That is every 100 factored starts, Fluorescent Penetrant Inspection to be completed. So far we have completed three consecutive inspections with zero findings. Since the Turbine operate as a peaking...
  7. Y

    Mitsubishi M701D Gas Turbine Part life and Number of Refurbishments

    Hi, I am new to Mitsubishi M701D Gas turbine and looking for Expected life of parts like Fuel Nozzle Holder, Fuel Nozzle, Combustion Basket and Transition Pieces. GE normally define the life of similar parts with number of refurbishment cycles that can go. Wonder if there is a similar document...