1. T

    Elevated Vibrations After Successful Commissioning Run

    Hi, After some advice, we recently undertook a MI on a FR6B unit unit was commissioned over a space of 5hrs run time and was base loaded to 45mw, all vibration levels were found to be more than acceptable with #1&2 bearings settling at 2.0-3.0mm/s for the duration of the run once the unit had...
Top