Log In
Join
Join the Community
Register
Log in
Or sign in with
Facebook
Google
GitHub
Linkedin
SIGN UP FOR OUR NEWSLETTER
Register
Main Menu
Home
Explore
Products
Cabinets & Panel Components
CNC Machines
Communication & Security
Connectors, Wire & Cable
Data Analytics & Simulation
Electrical Power Control
HMIs & SCADA
Motors & Controls
PLCs & PACs
Pneumatics & Hydraulics
Robotics
Safety
Sensors & Instruments
View all
Industry
Advanced Mfg
Agriculture
Automotive
Building
Chemical
Electronics
Energy & Infrastructure
Food & Beverage
Forest Products
Logistics
Medical & Pharma
Metal
Military & Aerospace
Natural Resources
Plastics & Polymers
Product Mfg
View all
Content
Ebooks
Forums
Industry Articles
Industry Webinars
Industry White Papers
News
Partner Content Hub
Technical Articles
Textbook
Tools
Worksheets
Articles
Latest
News
Technical Articles
Industry Articles
Industry White Papers
Forums
Latest
General Discussion
Hardware
Software
Communication
Education
Textbooks
Video Lectures
Worksheets
Industry Webinars
Ebooks
Tools
Videos
Latest
Industry Videos
Industry Webinars
Video Lectures
Giveaways
Partner Content Hub
Contact Us
Register
Log In
Network Sites
Search...
Home
Search
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
Search results
Search everything
Search threads
Search blogs
Keywords
Search titles only
Posted by
You may enter multiple names here.
Newer than
Search
Temperature Control at 19MW on our MS5001
That is pretty unusual.... both units experiencing problems with the same solenoid. And in your first post you said the actuators were checked. Anyway, thanks for the feedback! And glad you were able to solve the problems!
CSA
Post #5
Jun 7, 2019
Forum:
Power Generation
ACRNET Card for MARKV LED Diagnostic
>I can see using the EDIT ARCNET.BAT that the Card >Configuration is going on, but don't know if the card is >working properly. Okay, so it's an <I> operator interface, one provided by GE. I'm not familiar with ARCNET.BAT; ARCNET.<b>D</b>DAT, but not ARCNET.<b>B</b>AT. Here's an...
CSA
Post #4
Jun 4, 2019
Forum:
Power Generation
Synchronization
Thank you for the information!
CSA
Post #4
Jun 2, 2019
Forum:
Power Generation
Synchronization
alizareian67, Synchronization is the same in all Mark IV turbine control panels, regardless of the turbine it is controlling. I have never noticed the "modification" of SVL by TNH (percent of rated speed) to derive 'Speed Corrected Volts' before (or if I have, I have long since forgotten)...
CSA
Post #2
Jun 1, 2019
Forum:
Power Generation
Gross Calorific Value Effects
Dear, When a GE-design heavy duty gas turbine is being started (during initial firing attempt to establish flame) the fuel control valve is directed to open to some position and the resulting firing and exhaust temperature "is what it is". (Of course if the exhaust temperature is TOO high...
CSA
Post #9
May 30, 2019
Forum:
Power Generation
Loss of Excitation on 600 MW Power Plant
Burningman, So, a synchronous generator can become a non-synchronous (induction) generator when the excitation power is lost and the generator breaker is not tripped. HOWEVER, when that happens, the generator rotor usually gets very, Very, VERY hot in a pretty short period of time. And...
CSA
Post #2
May 30, 2019
Forum:
Power Generation
ACRNET Card for MARKV LED Diagnostic
Terminalman, Wow. It's interesting that you didn't say the computer to monitor parameters in the GE Mark V system was a GE-supplied <I> (running IDOS and MS-DOS) or a GE Mark V HMI (running some version of MS-Windows and CIMPLICITY and TCI (a background service necessary for the computer to...
CSA
Post #2
May 30, 2019
Forum:
Power Generation
SRV Calibration in AUTO mode with Mark V
Voyager2, Thank you for the feedback!!!
CSA
Post #4
May 28, 2019
Forum:
Power Generation
GT Frame 9E Mode Changeover Failure
Waqasbm, This is odd, because when the primary gas control valve is closing and is at 7% most of the fuel is being directed to the secondary- and transfer nozzles. You didn't mention what the secondary gas control was doing during the Lean-Lean to Premix Transfer.?.?.? What load are you...
CSA
Post #2
May 27, 2019
Forum:
Power Generation
Electronic OST test of Diesel Engine with Pump
You really need to consult the manuals for the diesel engine control system and/or the electronic overspeed protection device to understand what is possible. Yes, a lot of prime mover overspeed testing is done these days by lowering the overspeed trip setpoint on the electronic control system...
CSA
Post #2
May 24, 2019
Forum:
General Automation Chat
Gross Calorific Value Effects
Jhon, >Good day. Its urgent please I am unaware about GE turbines. >What is the design value of natural gas CV of GE turbine? I don't believe there IS a single design value of natural gas Calorific Value for GE-design heavy duty gas turbines. It's my understanding that when a potential...
CSA
Post #4
May 24, 2019
Forum:
Power Generation
Flame Eye/Detector in Gas Turbine
Coloftin, >Can an off the shelf Honeywell LG1093AA be hooked up >directly to the PTBA in a Mark 5? That's what the Mark V was designed to work directly with. The Mark V produces--and reads--335 VDC, so there is no need for an interface module. The only other flame detector I have ever...
CSA
Post #6
May 24, 2019
Forum:
Power Generation
SRV Calibration in AUTO mode with Mark V
Voyager2, Yes; Mark V AutoCalibrate automatically changes the servo-valve output regulator type from a Type 77 to a Type 43 when an SRV is selected. And, when the work on the SRV is complete and AutoCalibrate is exited, or another servo-operated device is selected, AutoCalibrate automatically...
CSA
Post #2
May 23, 2019
Forum:
Power Generation
What is the quantity of 1% FQL in gas turbines?
It's been a while since I've seen 'fql' expressed as a percent, but, things are always changing.... I believe if you find 'fql1' in the application code (I'm presuming you have either a Mark VI or a Mark VIe) using Finder, you will see that it comes from the liquid fuel flow divider's pulse...
CSA
Post #3
May 23, 2019
Forum:
Power Generation
Leakage of Lube Oil
Javad, >I work on upgrading of GE frame 9e, Mark IV. It seems that >Lube oil is leaked from bearings, and it should be charged >regularly in the lube oil tank. Does anybody have an >estimate about the amount of this leakage? How often we need >to charge new oil to the tank? This is...
CSA
Post #2
May 22, 2019
Forum:
Power Generation
Purge Air Flow Rate
Javad, No.
CSA
Post #4
May 21, 2019
Forum:
Power Generation
Temperature Control at 19MW on our MS5001
Good day, yhorsef, First of all, what kind of control system is being used on the two MS5001 gas turbines? And, is it SIMPLEX, DUAL Redundant, or TMR (Triple Modular Redundant)? Second, what alarms are present when you are running at Base Load? AND, if the control system is a GE Mark*...
CSA
Post #2
May 20, 2019
Forum:
Power Generation
Purge Air Flow Rate
Javad, I have never seen atomizing air flow-rate published or documented by GE or any of its packagers. I have only pressure ratios (1.1 when running on gas fuel; 1.2 when running on liquid fuel). Neither have I ever seen temperature, only the temperature of the air entering the Main...
CSA
Post #2
May 19, 2019
Forum:
Power Generation
VC3 Valve Hunting and Machine Tripping
AAkhan, Thank you for the information.
CSA
Post #4
May 19, 2019
Forum:
Power Generation
VC3 Valve Hunting and Machine Tripping
AAkhan, We are very sorry to hear about your troubles. The infamous 'LOSS OF FLAME TRIP' Process Alarm means flame has been lost in the majority of combustors with flame detectors for no known reason--in other words, there was not a trip condition or shutdown condition that would have...
CSA
Post #2
May 16, 2019
Forum:
Power Generation
1
2
3
…
Go to page
Go
10
Next
1 of 10
Go to page
Go
Next
Last
Top
Continue to site
QUOTE OF
THE DAY
“
”
-