1. safiquebpdb

    GE Frame 9E (Mark VIe) – Loss of Flame Trips Above 105 MW: FSRN/FSRT Crossover

    GE Frame 9E (Mark VIe) – Loss of Flame Trips Above 105 MW: FSRN/FSRT Crossover Hello everyone, I would appreciate technical advice from engineers experienced with GE Frame 9E gas turbines and Mark VIe control systems. We are experiencing a recurring Loss of Flame trip on our GE Frame 9E gas...
Top