Hello, we have a 132kV system with GT's supplying mains power at one end and 100kms away a production site stepped down to 6.6kV. For black starts and high load starts we have (x6) 1.5MW 6.6kV DGs. When we start from black the procedure is start a DG, synchronize with the GT's, set the DG's to...