1. M

    Gas Turbine SRV Leak Observation

    Hello Guys, I wanted to share a recent experience of mine on our Hitachi H-25 Gas Turbine Unit (with Mark-VI Control System) and wanted your recommendation / expert guidance in devising the way forward. We had our unit startup scheduled prior to which I checked the system, verified the...
  2. M

    MARK-VI VPRO CARD DIAGNOSTIC ALARMS

    Hello guys, Yesterday we had a failure of VPRO ‘Z’ card on our GT-A. The Z card was completely offline despite power supply to it being normal. Reading the manual and the threads here at control.com, it was quite evident that there had been internal short-circuiting in the card and it was now...
  3. M

    Hitachi H-25 Gas Turbine GCV-SRV Maintenance Overhauling

    Hello All, Looking for H-25 experts in this forum who can guide me regarding an observation we've picked on one of our gas turbines. We have two H-25 GTs installed at our site with Mark-VI Control System. GCV-SRV are of Shimadzu make while their hydraulic cylinder is of Yuken. We have been...
  4. M

    Gas Turbine Reverse Power Incident

    Hello Guys, Recently we experienced an interesting event at our site. We have a CCPP at our site operating in Island mode. There are two Hitachi H-25 GTs and one ST which make up the combined cycle. There is also a small Tornado GT of 5MW capability. We operate with one H-25 GT on Iso mode and...
  5. M

    Alstom Tornado Gas Turbine Expertise Required

    Hello guys, Anyone here an expert on Alstom EGT Tornado Gas Turbine? I have various queries which I want to straighten out regarding the turbine. We have one Tornado installed at our site and control system employed on it is Rustronic Mark-II. I don't have much experience on the said turbine...
  6. M

    "Backup Reference Temperature Active" Alarm

    Hi All, When does the following alarm appears on a GT running on Gas Fuel: "Backup Reference Temperature Active" Thanks in advance.
Top