We operate Hitachi gas turbines and perform online water washing every two weeks. The procedure requires the turbine to reach baseload, with the inlet guide vanes (IGVs) above 77% for the wash to start or continue.
However, when we initiate the water wash command, the turbine reduces its load by...
We operate Hitachi gas turbines and perform online water washing every two weeks. The procedure requires the turbine to reach baseload, with the inlet guide vanes (IGVs) above 77% for the wash to start or continue.
However, when we initiate the water wash command, the turbine reduces its load...